Arnold Wesley featured in Chicago Tribune!

BREAKING BUSINESS: Arnold Wesley Development was featured in the Business Section of the Chicago Tribune on Friday March 13, 2015. The article by Mary Ellen Podmolik highlights the rising costs for new construction homes near the city, and reaffirms Arnold Wesley’s product offering as an affordable housing alternative. Digital Plus Subscriptions are necessary for mobile phones, but from a computer the article could be read by clicking the link: Breaking Business – Chicago Tribune – Arnold Wesley or simply checking out the latest addition of the Chicago Tribune!

IMG_5683

 

 

 

 

Project Update: 3504 Oak Ave – Finished!

Arnold Wesley Development is excited to announce the completion of 3504 Oak Ave in Brookfield, IL. This project has been under contract during the construction phase and will soon be the new home of a very happy family! The buyers had an opportunity to customize their finish selections and the end result is truly outstanding! Take a look at a few pictures below.

IMG_5427

IMG_5435

IMG_5544

IMG_5434

IMG_5443

IMG_5441IMG_5499

IMG_5509IMG_5495

IMG_5501

IMG_5506

IMG_5428

IMG_5472

IMG_5460

IMG_5538

IMG_5534

IMG_5528

IMG_5451

IMG_5422

Update: 1013 Sherwood – La Grange Park

Arnold Wesley is making major progress on it’s gut-rehab and re-design + 2nd story addition at 1013 Sherwood in La Grange Park. The company has 5 current projects in the neighborhood with a 6th being acquired in March 2015. Check out the pictures below of the recent action:

IMG_5289

IMG_5417

IMG_5306

IMG_5305

IMG_5292

IMG_5310

IMG_20150213_143432233

 

Riverside Update: 18 N Herbert Rd + Pump House Project

Arnold Wesley Development is making huge progress on it’s Riverside, IL projects which include the renovation + expansion at 18 N Herbert Rd (corner of Herbert & Burlington) as well as the 2 new construction projects on Northgate Ct (Pump House Project).

Herbert will feature a brick and James Hardie exterior with top-end interior design finishes including Italian marble baths, custom order 1930’s-style stainless steel laboratory master bath vanity, master steam shower, master bath radiant heat floors, wet bar,  full house surround/intercom, fireplace, upgraded fixtures, hardware, and lighting package, custom mill work, crown, & hardwood floors throughout.

The Northgate Ct projects will feature 5,800 square foot above grade with another 1,500 in the full finished basements. Truly is a class by themselves, these premiere new construction projects will feature top-end custom finishes and design layout as well as professional grade appliances.

Pictures from both construction projects below:

IMG_20150130_145247863

IMG_20150130_145851639

IMG_20150130_145536189_HDR

IMG_20150130_145532132

IMG_20150130_145515298

IMG_20150123_141549791

IMG_20150130_143528128

IMG_20150130_143715975

IMG_20150130_143726221

IMG_20150130_142555414

IMG_20150130_142605544

IMG_20141230_141309309_HDR

IMG_20150130_143737153_HDR

IMG_20141230_141638998_HDR

IMG_20150130_145906376_HDR

IMG_20150123_145947153

IMG_20150123_145953590

IMG_20150123_150058534

Promotional Documentary + Pump House Project Video

Arnold Wesley Development recently released a Promotional Documentary video highlighting the companies vision & mission along with a mini-video showcasing the Pump House Project, which includes the demolition of Riverside’s old pumping station and the construction of 2 new custom single family homes. Check out the videos by clicking the links below:

PUMP HOUSE VIDEO

AW PROMOTIONAL DOCUMENTARY VIDEO

Special thanks to Rockit Projects, Cates Collaborative, and Patrick J Loughman for their efforts in producing these top quality videos!

Arnold Wesley Development Signs are in!

Arnold Wesley Development continues to connect it’s brand with the community & neighborhoods in which it works.  All “under construction” projects will proudly display the new aluminum/vinyl signs.

IMG_3177

Pictured: Spiro, Brian, and Danny @ 1423 Cleveland Ave La Grange Park

 

560AM – “Real Estate Live” – Arnold Wesley Showcase!

Arnold Wesley Development’s Brian W Welch and Spiro P Georgelos were guests on 560AM’s “Real Estate Live with Andrew Holmes” on Sunday September 14th. The segment showcased the success and rapid growth of the company and helped further establish Arnold Wesley Development as a pioneer within the Chicago real estate landscape. Here are some pics and a quick video from the day. A link to the recording will be added to the blog soon.

Quick Video Link: Brian discusses the company’s vision

 

IMG_2463  IMG_2467

IMG_2482  IMG_2487

IMG_2492  IMG_2486

Demolition on the pump house begins!

Demolition of the old Riverside Pump house began on Wednesday September 8th. Once demolished, the old water pumping station will become the location of 2 new custom 4,500 sq ft homes. Check out the quick video & pictures below.

Link to Youtube video: Click here to watch the roof get demolished!

 

IMG_2379 IMG_2382

IMG_2380  IMG_2397

IMG_2395  IMG_2410

IMG_2418  IMG_2398

 

 

1423 Cleveland – 2nd story addition complete

Arnold Wesley Development is making great progress on the renovation + expansion project at 1423 Cleveland. Framing is 100% complete and rough trades are in progress. The new 2nd story addition has been constructed and the interior has been gutted to the shell and re-designed to feature a vaulted/open foyer, open Kitchen layout, 4 bedrooms and 3 baths above grade with an additional 4th full bathroom in the basement. The basement will be finished with a fireplace and wet bar. Architectural Plans available for review by qualified buyers and their agents.

IMG_1699

IMG_1701

IMG_1703

IMG_1710

IMG_1702

IMG_1707

IMG_1712

IMG_1709

IMG_1713

IMG_1706

 

Riverside Pump House Update

After 2 public hearings the Village of Riverside unanimously voted to approved the demolition of the old Pump House as well as the division of the existing parcel into 2 separate lots. Upon Cook County approval, demolition should start around the weekend August 23rd. Two new construction luxury homes will be erected on site. Here is an artists rendering of the proposed plan for the North lot.

PUMP HOUSE 2 RENDERING